Centered on bottleneck analysis and line balancing: IE methods and lean tools systematically raise line efficiency and delivery.
04
Orders kept growing while capacity stood still: bottleneck operations capped line output, WIP piled mountain-high, overtime became routine, yet on-time delivery kept slipping. Management tried adding people and equipment — costs rose, efficiency didn't fundamentally move.
Lizheng attacked from "balance for efficiency": station-by-station measurement and IE analysis located bottlenecks and waste; line rearrangement, quick changeover, standard work and kanban management lifted whole-line efficiency systematically — without major new investment.
A few long-takt stations choke the whole line; adding people or equipment doesn't help.
Semi-finished goods pile up between operations — capital tied down, quality issues hidden.
Endless changeover prep devours effective output time.
Key stations rest with a few masters; any turnover wobbles the output.
Station-by-station takt measurement; rearrange and merge operations to level the line.
Separate and parallelize internal/external work to compress changeover time.
Standard work locks in the gains; extra motion and waiting eliminated.
Production status visualized — abnormalities surface and get handled fast.
Station timing and capacity analysis — let the data talk.
Line balancing, layout and changeover improvement plans delivered.
Verify on a model line; iterate and optimize.
Improvement manuals formed and copied to similar lines.
Bottleneck released — whole-line capacity steps up a level.
Smoother flow, freed floor space, less capital tied up.
Delivery capacity re-matched to order growth.
The client's own IE talent grows — improvement continues.
Note: outcomes are stated per client acceptance; more details available on call.