Starting from 6S and standard work: a safe, efficient and sustainable lean operations system for a power company.
03
New-energy stations are many, widespread and thinly staffed; equipment sits far from cities in complex environments, with near-zero tolerance for safety and stability lapses. The company had relied on experience-based management: rough shop-floor control, work standards varying by individual, maintenance by veterans' feel — quality rose and fell with personnel.
Lizheng's team moved into the stations. Guided by the "three reals" — the gemba, the actual object, the real facts — they started from 6S and visual management, then extended into standard work, equipment inspection and team building, erecting a replicable, sustainable lean operations system.
Tools and materials in disorder, no visual control — floor condition survives on inspection sprints.
Same operation, different practice by different hands; quality and safety rest on personal habits.
Perfunctory inspection, unknown equipment condition, reactive firefighting repairs.
Teams lack management handles; shift handovers are casual; nobody leads improvement.
Fixed-location management, visual standards and red-tag campaigns make problems obvious.
Standards built item by item for key operations — running, inspection and maintenance all follow rules.
Autonomous plus professional maintenance — equipment management turns from reactive to proactive.
Standardized team management; the kaizen-teian mechanism activates everyone.
Walk the stations, see the floor, interview the front line — an issue list takes shape.
6S and work standards built by area and by trade.
A benchmark station goes first — a visible model.
Model experience distilled into manuals and copied to all stations.
Placement and visuals in place — floor status can be seen, checked and compared anytime.
Key operations fully standardized; safety and quality stability markedly up.
Inspection system landed — hidden failures found and fixed early.
The proposal mechanism runs; the front line shifts from "made to improve" to "wanting to improve".
Note: outcomes are stated per client acceptance; more details available on call.
Book a free diagnostic review — on-site interviews and floor walks, with a dedicated diagnosis report.